ADB (Asian Development Bank)
♦   Emergency Rehibilitation of the Gas System in Afghanistan.
 

AGIP
♦   Allocation of Tiffany Platform Capex between Tiffany & Toni
♦   Operating Procedures Manuals - 45 systems for Tiffany Platform
♦   Instrument Loop Diagrams - Creation of 4500 ILDs
♦   COFP - Definition of HUC Logic To Arrive At Earliest First Oil
♦   Study of EPIC vs Distributed Contract for Tiffany
 

AIOC (Azerbaijan International Operating Company)
♦   Audit of GCA-1 &2 Well Planning for Drilling (with Noble Denton) 
 

AKER
♦   Feasibility Study for a TLP for Fina Exploration
♦   Feasibility Study for a TLP on Troll East for Statoil
♦   Layout Study for Monsanto Block 15/21a on an Aker H.4.2
♦   Feasibility Study for 40 Mbpd on an Aker H.4.2
♦   Layout Study for Floating Production Unit for the Miller Field
 

AMEC Process & Energy
♦   Pre-Conceptual Design of the Shell Shearwater Field Development
♦   Design Competition for the Shell  Shearwater Field Development
♦   Zero-Based Development & Cost Estimation of Natuna Gas Field 
♦   Expert Witness on Gas Plant Claim - Bangladesh 
♦   Major Capex Reduction Program for BP East of Shetlands TLP
♦   Major Capex Reduction Program for BP ETAPs
♦   Major Capex Reduction White Paper on BP Andrew 
♦   Front-End Briefing Paper on Heavy Oil Recovery Methods
♦   Front-End Briefing Paper on HPHT Field Development
♦   White Paper on Project Execution in the Caspian
♦   International Offshore Project Execution - A Benchmark Reference Paper
♦   Front-End Services for Lump Sum Bid on Akshabulak GOSP
♦   Audit of Design Basis on BP Bruce
♦   Audit for Minimum Facilities on ONGC Design 
♦   Consulting Services for Esso Balder Tender
♦   Services for Agip Tiffany Claim
♦   Consulting Services for Esso Natuna Project Management Prequal
♦   Due Diligence for Gujarat Fields, India
♦   60 Day Acceptance Review of Agip's Conceptual Design on Tiffany
♦   Layouts for MacCulloch Semi Conversion
♦   Layouts for Durwood/Dauntless FPSO Conversion
 

AMERADA HESS
♦   Economic Screening Study on Applications of HP Steam Offshore 
 

BRITISH GAS
♦   Audit of three field development options for five fields
♦  Design Mods on Morecambe Bay Stage II for Electrodialysis of MEG
♦   Electrical Engineering Consultant
♦   Feasibility Study for Condensate Handling on the Rough Field
♦   R&D Study on Desalting MEG on the Morecambe CPP1 Platform
♦   Capex & Schedule Risk Analysis for Morecambe Bay Phase I Stage II
♦   Conceptual Design for Morecambe Bay  Phase I Stage II
♦   Feasibility Study for Expansion of Wytch Farm 
 

BRITISH PETROLEUM (BP)
♦   FEED for Schiehallion FPSO Test Train Debottlenecking
♦   FEED for Angola Block 18 FPSO - Project Engineering and Cost Reduction
♦   Field Develop't Planning on the Gryphon & Forth Cluster (w/ GOSP)
♦   Audit of Cost Estimates for Downstream Facilities - USA vs UK 
♦   Audit of BP Standards re Catalogue Engineering 
♦   Study of S.E. Forties Developed by Catalogue Engineering 
 

CFEM
♦   Cost Estimate for the Tommeliten Wellhead Platform
♦   Feasibility Study for Hibernia on a THP-10,000
♦   Cost estimate for 20 Mbpd on the CFEM TH-2800 Semi-Submersible
♦   Feasibility Study for Ivanhoe Field using a THP-5500
♦   Conceptual Design Layouts for the Hibernia Field
♦   Layout Study for 20 Mbpd on the CFEM TH-2800 Semi-Submersible
♦   Layouts for Sole Pit
♦   Audit of the Host Platform for the Bunter Field
♦   Integrated deck layouts for Hibernia
♦   Layout modifications for the T-2600 Jack-up
♦   Topsides Layouts for Tiffany Field on a Semi-Susbmersible
♦   Layout Studies for the Balmoral Field on a Semi-Submersible
 

CHEVRON
♦   Value Engineering Consultancy on the Britannia Field Development
♦   Audit of Hibernia Topsides Weight (w/ GOSP)
♦   Capex Reduction Study for Alba (w/ GOSP) 
♦   Economic Screening Study of the Development of Alba & Bosun Fields 
♦   Consultancy on Ninian Field Development
 

CONFIDENTIAL
♦   Facilities Design for North Sea FPSO
 

CONOCO
♦   Value Engineering Consultancy on the Britannia Field Development
 

DEMINEX
♦   Cost Estimationfor Confidential N/S Oil Development
♦   R&D Study on Topsides Specification by Linear Programming
 

DPC (Dubai Petroleum Company)
♦   Optimization of Country Assets
 

EBRD (European Bank of Reconstruction & Development)
♦   Audit of the Fortum/Lukoil South Shapkino Development Plan
 

ELF AQUITAINE
♦  Training of Field Development Engineers on GOSP
 

ELKEM A/S
♦   Production of Course Materials for "Offshore Technology"
♦   Feasibility Study of the "Firmfoot Island" Concept
♦   Economic Screening Study of the "Firmfoot Island" Concept
 

ESSO
♦   Benchmarking of North Sea floating production
♦   Zero based development of Natuna
♦   Confidential Subsea Study
♦   Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
♦   R&D on a Four-Phase Centrifugal Separator
♦   Benchmark Studies for Guillemot (w/ GOSP)
♦   Development of Gas Condensate Facilities Capex Models (w/ GOSP)
♦   Brent Rationalization Studies (w/ GOSP)
♦   Minimum Facilities Study - USA vs UK vs Norway 
♦   R&D on UK Design Efficiency Benchmarks 
♦   R&D on UK Industry Competitiveness - Update 
♦   R&D on UK Topsides Design Manhour Reduction 
♦   Audit of Forties Facilities for Secondary Recovery 
♦   R&D on Cost Reduction Through Technical Innovation 
♦   R&D on UK Industry Competitiveness
♦   Survey of UK Industry Relative Competitiveness
♦   Feasibility Study of the Pars Field Development w/ OSCO/NIOC 
♦   Detailed Design of Pulai A & B Platforms 
♦   Detailed Design of Conversion of Utilities Modules on Tembungo 
♦   Design Basis Memorandum (DBM) for Okinawa Refinery 
♦   Design Basis Memorandum (DBM) for Singapore Refinery 
♦   EPC, Start-up & Operations for the Esso Singapore Refinery 
♦   Debottlenecking Expansion Design for the Singapore Refinery 
♦   Sulphur Plant Design and Construction for the Singapore Refinery 
♦   Training Course on "Singapore Refinery Technology" - 4 x 1 week 
♦   Training Course on "Refinery Design" - 6 weeks Singapore Refinery 
 

W.R. GRACE
♦   Audit of Cost and Weight Estimates for Petromina Natuna
 

HAMILTON OIL
♦   Feasibility Study for the Priazlomnoye Development in Russia
 

HERITAGE OIL & GAS
♦   Review of Unawa & No. Balol Well Architecture & Skin Factor Calculations
♦   Negotiation with the Government of India for the  PSC(s) on  6 Onshore Oil & Gas Fields 
 

JAPAN EXPLORATION (JAPEX)
♦   Training Course on "Oil & Gas Field Development"
 

JAPAN VIETNAM PETROLEUM Co. Ltd
♦   Technical Audit of Basic Design of the Rang Dong Field Wellhead & FPSO
 

KERR McGEE
♦   Field Develop't Planning on the Gryphon & Forth Cluster (w/ GOSP)
♦   Minimum Facilities Study on Gryphon (w/ GOSP)
♦   Minimum Facilities Wedding Cake for the Scott Field (w/ GOSP)
 

LEWIS & PEAT
♦   Farm-in for 125MMb oil field in Kazakhstan
♦   Takeover of 350 MMbbl company in Kazakhstan
♦   Export refinery study – Eastern Europe
♦   Audit of the Batumi Refinery – Georgia, FSU
♦   Audit of Investment Proposal for Karachaganak Mini-Refinery
♦   Audit of Investment Proposal for Exploration Offshore Sierra Leone
♦   Research & Valuation of Serbian National Oil Company
♦   Field Development Plan for Caspian Sea Project
 

MARATHON 
♦   Debottlenecking Study of Brae
♦   Process Engineering Consultancy on East Brae
 

MAERSK OIL & GAS
♦   Safety Audit of Halfdan Process Facilities
 

MOBIL
♦   Cost Estimation for Southern Gas Platforms 
♦   Contracts Preparation, Tendering, and Conditioning
 

NAM
♦   Operations Philosophy for F-3 Development
♦   Process Audit for the F-3 Development
♦   Project Management Services on the Ameland Project
♦   Feasibility Study of F-7/Emden 
 

NOBLE DENTON
♦   Audit of Redevelopment Risks on Two Fields in Lithuania
♦   Audit of Azerbaijan International Operating Co. Well Planning
♦   Process Operations Review of Conoco MacCullough FPSO
 

NORSK HYDRO 
♦   Audit of Statement of Commerciality
♦   Layout Study for Troll East
♦   Feasibility Study of Exhaust Gas Injection for Ekofisk
♦   Statement of Commerciality for the Troll Field
♦   Layout Study - Sleipner West Alternative II
♦   Layout Studies for Gullfax Phase II
♦   Platform Layouts for Block 30/9 Studies
♦   Economic Screening Study of 4 Floating Substructures for Troll West
♦   Layout Studies for Fixed Steel Platforms for Troll
♦   Layout Studies for a Catenary Anchored Floater for Troll
♦   Troll Subsea Studies
♦   Riser Layout Studies for Oseberg GBS
♦   Topsides Layouts for Sleipner
♦   Design Philosophies for Troll
♦   Audit of Troll Layouts
♦   Audit of the Brage Field Feasibility Study Layouts
♦   Topsides Layouts for Troll East
♦   Audit of the Topsides for the Oseberg Field Centre
♦   Audit of Troll Development Layouts
♦   Feasibility Study for the Sleipner Field
♦   Audit of the Sleipner Field Development
♦   Audit of the Oseberg Platform
 

NPC
♦   Screening Economics Study for Gullfax Phase II 
♦   Screening Economics study for Sleipner Gamma 
♦   Training Course on "Production Engineering Design" - 2 Weeks (2)
 

NPD
♦   Cost Risk Analysis on Brage Development
♦   Field Development Planning - Haltenbanken
 

OMV
♦   Contracting Strategy for Iranian Buy-Back Contract Development 
 

OCCIDENTAL
♦   Design & Field Revamp of De-Methanizer in GOSP 103A/D - Libya 
♦   Safety Study for Zueitina Gas Plant - Libya 
♦   Feasibility Study for Crude Stabilization in GOSP 103A/D - Libya 
♦   Feasibility Study for Eugene Island Block 327 - USA 
 

OFFSHORE DESIGN PARTNERSHIP
♦   Design Of Onshore Slug Catcher
 

QGPC
♦   Pipeline Project Engineering Consultancy in Doha, Qatar
♦   Consultation of the Development of the Nam Uhr Reservoir
 

PETRONAS
♦   Training Course on "Offshore Operations" - 2 weeks -Malaysia
 

PROCESS ANALYSIS
♦   Audit of the Esmond Field
♦   Audit of Gulf of Mexico Platforms for Insurance Acceptance
 

PHILLIPS
♦   Layout Study for the Espoir Field
♦   Detailed Design of Jack-up Conversion for Production - Espoir Field 
♦   Detailed Design of VLCC Conversion for FSU - Espoir Field 
 

REPUBLIC of AZERBAIJAN
♦   Negotiation of PSC for Guneshili, Chirag & Azeri with Western Oil Co’s
 

RUTHERFORD OIL & GAS
♦   EPC of Host Production Platform on Texas Block 310L 
♦   EPC of Satellite Drilling Platform on Texas Block 331L 
 

SAGA 
♦   Equipment Definitions for Snorre
♦   Feasibility Study of an Integrated Concrete Deck
♦   Field Development Study - Block 2/2
♦   Additional Development Scenarios for Snorre
♦   Vessel Contractors Layout for Snorre TLP
♦   Feasibility Study for Snorre - TLP - Live vs. Dead Crude
♦   Process Screening Study - Gullfax Soer - Central vs. Satellite
♦   Feasibility Study for Snorre - Monotower GBS plus Floater
♦   Process Screening Studies for Snorre - Live vs Dead Crude
♦   Layout Studies for Gullfax Phase II - Steel vs GBS
♦   Feasibility Study for the Haltenbaken Development
♦   Production of the Scope of Work for the East Troll Conceptual Design
♦   Wellhead Piping Study for Gullfax Phase II
♦   Field Development Planning for Gullfax Phase II
 

SCIMITAR PETROLEUM
♦   Feasibility Study of Expansion of Dubai Gas Plant 
 

SHELL
♦   Independent Cost Estimate of Southern Swamp Associated Gas Gathering (Nigeria)
♦   Extended Reach Subsea Review
♦   Feasibility Study of Packaged Drill Rigs for Nelson
♦   Training of Field Development Engineers on GOSP
♦   Minimum Greenfield Modex of Cormorant/Dunlin (w/ GOSP)
♦   Screening Economics & Feasibility Studies on Brent 2000 (w/ GOSP)
♦   Pre-Conceptual Methodology for Brent 2000
♦   Pre-Conceptual Design of the Nelson Field Development (w/GOSP)
♦   Design of Project Co-ordination Procedures for Nelson
♦   Minimum Facilities Consultants During Detailed Design of Gannet 
♦   Minimum Facilities Feasibility Study on Guillemot (w/GOSP) 
♦   Engineering Study of Troll Field
♦   Audit of Troll Field Development
♦   Development of the Scope of Work for Eider Follow-On
♦   Process Engineering Consultancy for Eider
♦   Audit of Detailed Design of Eider
♦   Audit of a Minimum Self-Contained Drilling/Production Platform
♦   Audit for Simplification of Specifications & Requisitions on Tern
♦   Audit of Hook-up Readiness for S.E. Indy
♦   Oil Pipeline Hydrate Study - Eider
♦   Audit for Simplification of the Eider Drilling System (vs No. Cormorant)
♦   Audit for Simplification of the Eider Field
♦   Tern Fabrication Yard Plan 
♦   Development of the Scope of Work for the Tern Tender
♦   Audit of the Design and HUC of S.E. Indy
♦   Eider Minimum Facilities Study
♦   Weight and Cost Estimation for the Eider Integrated Deck
♦   Audit of the South East Indy Development
♦   Audit of the Eider Design Basis for Minimum Facilities
♦   Conceptual Design of Troll as a Floater 
♦   Feasibility Study for Subsea Development of S.E. Auk 
♦   Feasibility & Conceptual Design of No. Cormorant Field 
 

SINOPEC
♦   Training course at Imperial on Surface Facilities – 2 x 4 days
♦   Training course at Imperial on Overseas Operations – 2 x 4 days
 

SPUR ENGINEERING (CALGARY)
♦   Audit and Cost Estimation for a Confidential N/S Oilfield
 

STATOIL
♦   Pre-Study of Layout Acceptance Criteria 
♦   Layout Study for a Tension Legged Platform for Troll 
♦   Audit of Sleipner Area Development - Phase II
 

TIMAN OIL & GAS PLC
♦   Facilities & Management Audit – Water Flood – Urals, Russia
 

TENNECO
♦   Field Development Planning For Block 30/18 - HTHP 
 

TEXACO
♦   Optimization of Strathspey as a Fixed Platform 
♦   Feasibility Study of Strathspey as a Fixed Platform 
 

TEXAS TRADING POST
♦   Feasibility Studies of Beef Drying Systems
 

TOTAL OIL MARINE
♦   Technical Author for Dunbar
♦   Feasibility Study for Unmanned Minimum Topsides Facilities 
 

WARTSILA TURKU
♦   Feasibility Study of Semi-Submersible Conversion 
 

WEDDERBURN SECURITIES PLC
♦   License applications and development of nine oil fields in Kazakhstan
 

WEIR WESTGARTH
♦   Study of Stainless Steel Pipe Stress for Desalination 
 


 
Home Page
Oil & Gas
Process
Energy
Consulting
Mgmt
Track Record
& & & & & & &
& & & & & & &
&
Upstream
Chemical
Power Plants
&
Chairman
By Country
&
Offshore
Water
Renewable
&
Chief Exec
By Client
&
Onshore
Waste
Waste-to-Energy
& &
By Substructure
&
Downstream
Management
PEF
& &
By Service
&
Refining
& & & & &
&
Gas-to-Liquids
& & & & &