TRACK RECORD
BY COUNTRY
 

AFRICA
 

ANGOLA
♦   FEED & Cost Reduction for FPSO – BP Block 18
♦   Update of Design, Cost & weight of ‘PAJ’ FPSO – BP Block 31 SE

GABON
♦   Identified Root Cause of 13 firetube failures in FWKO & Heater Treaters – Shell 
♦   Identified Root Cause of 5 Integral Compressors decline to 20% availability - Shell
♦   Optimazation of Gamba Facilities Debottlenecking, 22,000 bpd to 109,000 bpd - Shell
♦   Crude dehydration alternatives for 6 month Inspection/Repair of T-3401
♦   Design for sand removal from gas feed to Gas Lift Compressors
♦   Design for removal of liquids from feed to Gas Lift System

IVORY COAST
♦   Layout Study for the Espoir Field
♦   Detailed Design of Jack up Conversion for Production – Espoir Field 
♦   Detailed Design of VLCC Conversion for FSU – Espoir Field

LIBYA
♦   Design & Field Revamp of De-Methanizer in GOSP 103A/D
♦   Safety Study for Zueitina Gas Plant
♦   Feasibility Study for Crude Stabilization in GOSP 103A/D

MOZAMBIQUE
♦   Modernization & Expansion of the Sasol Temane Gas Plant

NIGERIA
♦   Independent Cost Estimate of Southern Swamp Associated Gas Gathering Project

SERRA LEONE
♦   Audit of Investment Proposal for Exploration Offshore Sierra Leone

SOUTH AFRICA
♦   Engineering Manager for Feasibility Studies on multiple Thermal Power Plants:
♦   10 GW power plant in Johannesburg using ENI/Anadarko gas from a 2,500 km, 42 inch pipeline
                from Northern Mozambique
♦   10 GW power plant in Mozambique using 500 kV High Voltage Direct Current (HVDC) Transmission
                2,500 km to Johannesburg
♦   3 GW onshore power plant fed from offshore LNG gasification terminal
♦   2 GW power plant in Western Cape fed from offshore FPSO & deep-water gas field
♦   150 MW thermal power plant using detoxified MSW (biomass) as fuel
♦   15 MW thermail power plant using detoxified MSW (biomass) as fuel
♦   Modex on 122 MGJ/an Gas Plant to 183 MGJ/an
♦   Multiple optimization & safety projects on the 183 MGJ/an Gas Plant
♦   Troubleshooting on HP Compression, LP Compression & SRB/H2S Removal
♦   Training staff in HYSYS & Que$tor
♦   Wrote SPI Philosophies for Pressure Equipment & Project Management
♦   Facilities & drilling design & estimation for bidding Mozambique Round 4
♦   Consultancy on H2S problem on Partner-Operated Gabon FPSO
 
 

ASIA-PACIFIC
 

AFGHANISTAN
♦   Emergency Rehabilitation of Gas Supply and Distribution

BANGLADESH
♦   Expert Witness on Gas Plant Arbitration

CHINA
♦   Lead a 2 week seminar/course in 1979 on offshore production for the Ministry of Oil & Gas.

INDIA
♦   Negotiation of PSC and COSA for Six Gujarat Fields
♦   Technical & Investment Analysis for Six Gujarat Fields 
♦   Due Diligence for Seven Gujarat Fields
♦   Audit for Minimum Facilities on ONGC Design

INDONESIA
♦   Zero-Based Development of Natuna
♦   Audit of Natuna Cost and Weight Estimates
♦   Consulting Services for Natuna Project Management Prequalification
♦   Zero-Based Audit of Bayu Udan FPSO

JAPAN
♦   Design Basis Memorandum (DBM) for Okinawa Refinery 
♦   Training Course on "Oil & Gas Field Development"

MALASIA
♦   Detailed Design of Pulai A & B Platforms 
♦   Detailed Design of Conversion of Utilities Modules on Tembungo 
♦   Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
♦   Training Course on "Oil & Gas Field Development" - 1 week
♦   Training Course on "Offshore Operations" - 2 weeks

SINGAPORE
♦   Design Basis Memorandum (DBM) for Singapore Refinery 
♦   Debottlenecking Expansion Design for the Singapore Refinery 
♦   Sulphur Plant Design and Construction for the Singapore Refinery 
♦   Training Course on "Singapore Refinery Technology" - 4 x 1 week 
♦   Training Course on "Refinery Design" - 6 weeks Singapore Refinery 

VIETNAM
♦   Technical Audit of Basic Design of the Rang Dong Field
 
 

EUROPE & SCANDINAVIA
 

FINLAND
♦   Feasibility Study of Semi-Submersible Conversion 

FRANCE
♦   Cost Est. for 20 Mbpd on the CFEM TH-2800 Semi-Submersible
♦   Layout Study for 20 Mbpd on the CFEM TH-2800 Semi-Submersible
♦   Layout Modifications for the CFEM T-2600 Jack-up
♦   Training of Field Development Engineers on GOSP

HOLLAND
♦   Operations Philosophy for F-3 Development
♦   Process Audit for the F-3 Development
♦   Project Management Services on the Ameland Project
♦   Feasibility Study of F-7/Emden 

MONACO
♦   Turret & topsides Pre-FEED Study for BP PAJ FPSO in Block 31 Angola
♦   Turret & topsides design for Petrobras Capixaba FPSO, offshore Brazil
♦   Turret & topsides design for Petrobras Tupi Pilot FPSO, offshore Brazil
♦   Turret design for Petrobras Tupi FPSO, offshore Brazil
♦   Turret design for Nexus FPSO
♦   Turret design for Shell LNG FPSO
♦   Turret design for BP Quad 204 (Schiehallion) FPSO, UK
♦   Turret design for Shtokman FPSO

NORWAY
♦   Minimum Facilities Study - USA vs. UK vs. Norway 
♦   Field Development Options Study for South Arne
♦   Feasibility Study for a TLP for Fina Exploration
♦   Feasibility Study for a TLP on Troll East for Statoil
♦   Feasibility Study for 40 Mbpd on an Aker H.4.2
♦   Cost Estimate for the Tommeliten Wellhead Platform
♦   Production of Course Materials for "Offshore Technology"
♦   Feasibility Study of the "Firmfoot Island" Concept
♦   Economic Screening Study of the "Firmfoot Island" Concept
♦   Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
♦   Audit of Statement of Commerciality
♦   Layout Study for Troll East
♦   Feasibility Study of Exhaust Gas Injection for Ekofisk
♦   Statement of Commerciality for the Troll Field
♦   Layout Study - Sleipner West Alternative II
♦   Layout Studies for Gullfax Phase II
♦   Platform Layouts for Block 30/9 Studies
♦   Economic Screening Study of 4 Floating Substructures for Troll West
♦   Layout Studies for Fixed Steel Platforms for Troll
♦   Layout Studies for a Catenary Anchored Floater for Troll
♦   Troll Subsea Studies
♦   Riser Layout Studies for Oseberg GBS
♦   Topsides Layouts for Sleipner
♦   Design Philosophies for Troll
♦   Audit of Troll Layouts
♦   Audit of the Brage Field Feasibility Study Layouts
♦   Topsides Layouts for Troll East
♦   Audit of the Topsides for the Oseberg Field Centre
♦   Audit of Troll Development Layouts
♦   Feasibility Study for the Sleipner Field
♦   Audit of the Sleipner Field Development
♦   Audit of the Oseberg Platform
♦   Cost Risk Analysis on Brage Development
♦   Field Development Planning - Haltenbanken
♦   Screening Economics Study for Gullfax Phase II 
♦   Screening Economics study for Sleipner Gamma 
♦   Training Course on "Production Engineering Design" - 2 Weeks 
♦   Equipment Definitions for Snorre
♦   Feasibility Study of an Integrated Concrete Deck for Snorre
♦   Field Development Study - Block 2/2
♦   Additional Development Scenarios for Snorre
♦   Vessel Contractors Layout for Snorre TLP
♦   Feasibility Study for Snorre - TLP - Live vs. Dead Crude
♦   Process Screening Study - Gullfax Soer - Central vs. Satellite
♦   Feasibility Study for Snorre - Monotower GBS plus Floater
♦   Process Screening Studies for Snorre - Live vs. Dead Crude
♦   Layout Studies for Gullfax Phase II - Steel vs. GBS
♦   Feasibility Study for the Haltenbaken Development
♦   Production of the SoW for the East Troll Conceptual Design
♦   Wellhead Piping Study for Gullfax Phase II
♦   Field Development Planning for Gullfax Phase II
♦   Engineering Study of Troll Field
♦   Audit of Troll Field Development
♦   Conceptual Design of Troll as a Floater 
♦   Pre-Study of Layout Acceptance Criteria 
♦   Layout Study for a Tension Legged Platform for Troll 
♦   Audit of Sleipner Area Development - Phase II
♦   Consulting Services for Esso Balder Tender

SWEDEN
♦   Audit of Halfdan Detailed Design

UNITED KINGDOM
♦   Turret Design for Quad 204 FPSO (new Schiehallion)
♦   FEED for Schiehallion FPSO Test Train Debottlenecking
♦   Turret Design for Nexus FPSO
♦   FEED for Schiehallion FPSO Test Train Debottlenecking
♦   Audit of three field development options for five offshore gas fields
♦   Benchmarking of North Sea floating production - Esso
♦   Design Competition for the Shell  Shearwater Field Development
♦   Pre-Conceptual Design of the Shearwater Field Development
♦   Facilities Design for a North Sea FPS
♦   Process Operations Review of Conoco MacCulloch FPSO
♦   Confidential Subsea Study
♦   Allocation of Tiffany Platform Capex between Tiffany & Toni (GOSP) 
♦   Operating Procedures Manuals - 45 systems for Tiffany Platform
♦   Tiffany Instrument Loop Diagrams - Creation of 4500 ILD's
♦   Tiffany COFP - Definition of HUC Logic To Arrive At Earliest First Oil
♦   Study of EPIC vs. Distributed Contract for Tiffany
♦   Layout Study for Monsanto Block 15/21a on an Aker H.4.2
♦   Layout Study for Floating Production Unit for the Miller Field
♦   Layouts for MacCulloch Semi Conversion
♦   Layouts for Durwood/Dauntless FPSO Conversion
♦   Major Capex Reduction Program for BP East of Shetlands TLP
♦   Major Capex Reduction Program for ETAPs
♦   Major Capex Reduction White Paper on Andrew 
♦   Front-End Briefing Paper on Heavy Oil Production
♦   Front-End Briefing Paper on HPHT Field Development
♦   Audit of Design Basis on Bruce 
♦   Consulting Services for Tiffany Claim
♦   60 Day Acceptance Review of Agip's Conceptual Design on Tiffany
♦   Design Mods on Morecambe Bay Stage II for Electrodialysis of MEG
♦   Electrical Engineering Consultant
♦   Feasibility Study for Condensate Handling on the Rough Field
♦   R&D Study on Desalting MEG on the Morecambe CPP1 Platform
♦   Conceptual Design for Morecambe Bay  Phase I Stg II
♦   Capex & Schedule Risk Analysis for Morecambe Bay Phase I Stg II
♦   Feasibility Study for Expansion of Wytch Farm 
♦   Economic Screening Study on Applications of HP Steam Offshore 
♦   Field Develop't Planning on the Gryphon & Forth Cluster (GOSP)
♦   Audit of Cost Estimates for Downstream Facilities - USA vs. UK 
♦   Audit of BP Standards re Catalogue Engineering 
♦   Study of S.E. Forties Developed by Catalogue Engineering 
♦   Feasibility Study for Ivanhoe Field using a THP-5500
♦   Layouts for Sole Pit
♦   Layouts for MacCulloch Semi Conversion
♦   Layouts for Durwood/Dauntless FPSO Conversion
♦   Audit of the Host Platform for the Bunter Field
♦   Topsides Layouts for Tiffany Field on a Semi-Submersible
♦   Layout Studies for the Balmoral Field on a Semi-Submersible
♦   Value Engineering Consultancy on the Britannia Field Development
♦   Capex Reduction Study for Alba (GOSP) 
♦   Economic Screening of the Development of Alba & Bosun Fields 
♦   Consultancy on Ninian Field Development
♦   Cost Estimation for Confidential N/S Oil Development
♦   R&D Study on Topsides Specification by Linear Programming
♦   Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
♦   Benchmark Studies for Guillemot (GOSP)
♦   Development of Gas Condensate Facilities Capex Models (GOSP)
♦   Brent Rationalization Studies (GOSP)
♦   Minimum Facilities Study - USA vs. UK vs. Norway 
♦   R&D on UK Design Efficiency Benchmarks 
♦   R&D on UK Industry Competitiveness - Update 
♦   R&D on UK Topsides Design Manhour Reduction 
♦   Audit of Forties Facilities for Secondary Recovery 
♦   R&D on Cost Reduction Through Technical Innovation 
♦   R&D on UK Industry Competitiveness
♦   Survey of UK Industry Relative Competitiveness
♦   Field Develop't Planning on the Gryphon & Forth Cluster (GOSP)
♦   Minimum Facilities Study on Gryphon (w/ GOSP)
♦   Debottlenecking study of Brae
♦   Process Engineering Consultancy on East Brae
♦   Cost Estimation for Southern Gas Platforms 
♦   Contracts Preparation, Tendering, and Conditioning
♦   Design Of Onshore Slug Catcher
♦   Audit of the Esmond Field
♦   Extended Reach Subsea Review
♦   Feasibility Study of Packaged Drill Rigs for Nelson
♦   Training of Field Development Engineers on GOSP
♦   Minimum Greenfield Modex of Cormorant/Dunlin (GOSP)
♦   Screening Economics & Feasibility Studies on Brent 2000 (GOSP)
♦   Pre-Conceptual Methodology for Brent 2000
♦   Pre-Conceptual Design of the Nelson Field Development (GOSP)
♦   Design of Project Co-ordination Procedures for Nelson
♦   Minimum Facilities Consultants During Detailed Design of Gannet 
♦   Minimum Facilities Feasibility Study on Guillemot (GOSP)
♦   Development of the Scope of Work for Eider Follow-On
♦   Process Engineering Consultancy for Eider
♦   Audit of Detailed Design of Eider
♦   Audit of a Minimum Self-Contained Drilling/Production Platform
♦   Audit for Simplification of Specifications & Requisitions on Tern 
♦   Audit of Hook-up Readiness for S.E. Indy
♦   Oil Pipeline Hydrate Study - Eider
♦   Audit for Simplification of the Eider Drilling System
♦   Audit for Simplification of the Eider Field
♦   Tern Fabrication Yard Plan – Phase 1
♦   Development of the Scope of Work for the Tern Tender
♦   Audit of the Design and HUC of S.E. Indy
♦   Eider Minimum Facilities Study
♦   Weight and Cost Estimation for the Eider Integrated Deck
♦   Audit of the South East Indy Development
♦   Audit of the Eider Design Basis for Minimum Facilities
♦   Feasibility Study for Subsea Development of S.E. Auk 
♦   Feasibility & Conceptual Design of No. Cormorant Field 
♦   Audit and Cost Estimation for a Confidential N/S Oilfield
♦   Feasibility Studies of Beef Drying Systems
♦   Technical Author for Dunbar
♦   Feasibility Study for Unmanned Minimum Topsides Facilities 
♦   Study of Stainless Steel Pipe Stress for Desalination 
♦   Field Development Planning For Block 30/18 - HTHP 
♦   Optimization of Strathspey as a Fixed Platform 
♦   Feasibility Study of Strathspey as a Fixed Platform 
 
 

FORMER SOVIET UNION
 

AZERBAIJAN
♦   Negotiation of PSA for GCA with the Western Oil Companies
♦   Audit of GCA 1 & 2 Well Planning for Drilling
♦   White Paper on Project Execution in the Caspian Sea

GEORGIA
♦   Audit of Batumi Refinery in Adjaria

KAZAKHSTAN
♦   License applications and development of nine oil and gas fields
♦   Technical analysis and negotiation of farm-in for 50 MMbbl oil field
♦   Technical & Investment Analysis for 125 MMbbl field
♦   Audit of Investment Proposal for Karachaganak Mini-Refinery
♦   Front-End Services for Lump Sum on Akshabulak Field Facilities 
♦   White Paper on Project Execution in the Caspian

LITHUANIA
♦   Audit of Redevelopment Risks on Two Oil Fields

RUSSIA
♦   Facilities & Management Audit – Water Flood 
♦   Field Development Audit of So. Shapkino Development
♦   Feasibility Study for the Priazlomnoye Development
♦   Market Survey for Location & DBM of a Russian Export Refinery

TURKMENISTAN
♦   Field Development & Cost Estimate in the Caspian Sea

UZBEKISTAN
♦   Due diligence on investment in 2 Blocks of oil & gas. 
 
 

MIDDLE EAST
 

DUBAI
♦   Feasibility Study of Expansion of Dubai Gas Plant 
♦   Country Asset Optimisation

IRAN
♦   Feasibility Study of the Pars Field Development
♦   Contracting Strategy for Iranian Buy-Back Contract Development

QATAR
♦   Pipeline Project Engineering Consultancy in Doha, Qatar
♦   Consultation of the Development of the Nam Uhr Reservoir
 
 

NORTH AMERICA
 

CANADA
♦   Feasibility Study for Hibernia on a THP-10,000
♦   Conceptual Design Layouts for the Hibernia Field
♦   Integrated Deck Layouts for Hibernia
♦   Audit of Hibernia Topsides Weight (GOSP)

UNITED STATES
♦   EPC of Host Production Platform on Texas Block 310L 
♦   EPC of Satellite Drilling Platform on Texas Block 331L 
♦   Feasibility Study for Eugene Island Block 327 - USA 
♦   Audit of Gulf of Mexico Platforms for Investment Institutions
♦   R&D on a Four-Phase Centrifugal Separator
♦   Audit of Cost Estimates for Downstream Facilities - USA vs. UK 
♦   Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
♦   Minimum Facilities Study - USA vs. UK vs. Norway 
 
 

SOUTH AMERICA
 

ARGENTINA
♦   Negotiation with YPF for the Mgt Contract on Projecto Mega

BRAZIL
♦   Topsides & Turret Design for Tupi FPSO – Petrobras
♦   Topsides & Turret Design for Capixaba FPSO – Petrobras
♦   Turret Design for Tupi Pilot FPSO - Petrobras
 


 
Home Page
Oil & Gas
Process
Energy
Consulting
Mgmt
Track Record
& & & & & & &
& & & & & & &
&
Upstream
Chemical
Power Plants
&
Chairman
By Country
&
Offshore
Water
Renewable
&
Chief Exec
By Client
&
Onshore
Waste
Waste-to-Energy
& &
By Substructure
&
Downstream
Management
PEF
& &
By Service
&
Refining
& & & & &
&
Gas-to-Liquids
& & & & &