TRACK RECORD
BY SUBSTRUCTURE
TANKERS
♦
FEED for Schiehallion FPSO Test Train Debottlenecking - BP
♦
FEED for Greater Plutonio FPSO - BP Angola
♦
Detailed Design of VLCC Conversion for FSU - Espoir Field - Phillips
♦
Benchmarking of North Sea floating production - Esso
♦
Technical Audit of Basic Design of the Rang Dong Field Wellhead & FPSO
-
JapanVietnamPetroleum Co. Ltd
♦
Process Operations Review of Conoco McCullough FPSO - Noble Denton
♦
Facilities Design for North Sea FPSO - Confidential Client
♦
Design Philosophies for Troll Oil by Tankers- Norsk Hydro
♦
Field Development Planning on the Gryphon & Forth Cluster - Kerr McGee
♦
Layouts for Durwood/Dauntless FPSO Conversion - AMEC
♦
Consulting Services for Esso Balder Tender – AMEC
POWER GENERATION
♦
Engineering Manager for Feasibility Studies on multiple Thermal Power Plants:
♦
10 GW power plant in Johannesburg using ENI/Anadarko gas from a 2,500 km,
42 inch pipeline from Northern Mozambique
♦
10 GW power plant in Mozambique using 500 kV High Voltage Direct Current
(HVDC) Transmission 2,500 km to Johannesburg
♦
3 GW onshore power plant fed from offshore LNG gasification terminal
♦
2 GW power plant in Western Cape fed from offshore FPSO & deep-water
gas field
♦
150 MW thermal power plant using detoxified MSW (biomass) as fuel
♦
15 MW thermail power plant using detoxified MSW (biomass) as fuel
♦
Modex on 122 MGJ/an Gas Plant to 183 MGJ/an
♦
Multiple optimization & safety projects on the 183 MGJ/an Gas Plant
♦
Troubleshooting on HP Compression, LP Compression & SRB/H2S Removal
♦
Training staff in HYSYS & Que$tor
♦
Wrote SPI Philosophies for Pressure Equipment & Project Management
♦
Facilities & drilling design & estimation for bidding Mozambique
Round 4
♦
Consultancy on H2S problem on Partner-Operated Gabon FPSO
BARGES/FPSO
♦
Zero-Based Development of Natuna – Esso/AMEC/Kaverner
TLPs
♦
Major Capex Reduction Program for BP East of Shetlands TLP - AMEC
♦
Feasibility Study of Snorre - TLP - Live vs. Dead Crude - Saga
♦
Feasibility Study of TLP for Fina Exploration - AKER
♦
Feasibility Study of TLP on Troll East for Statoil - AKER
♦
Economic Screening of Additional Development Scenarios for Snorre - Saga
♦
Equipment Definitions for Snorre - Saga
♦
Layout Study of Tension Legged Platform for Troll - Statoil
♦
Layout Study of Snorre TLP - Saga
SEMISUBMERSIBLES
♦
Conceptual Design of Troll as a Floater - Norske Shell
♦
Feasibility Studies of Snorre - Monotower GBS plus Floater - Saga
♦
Feasibility Study of Semi-Submersible Conversion - Wartsila Turku
♦
Feasibility Study of 40 Mbpd on an Aker H.4.2 - AKER
♦
Feasibility Study of the Ivanhoe Field using a THP-5500 - CFEM
♦
Feasibility Study of Hibernia on a THP-10,000 - CFEM
♦
Economic Screening of Additional Development Scenarios for Snorre - Saga
♦
Economic Screening of Four Floaters for Troll West - Norsk Hydro
♦
Conceptual Design Layouts for the Hibernia Field - CFEM
♦
Layout Study of Monsanto Block 15/21a on an Aker H.4.2 - AKER
♦
Layout Study of Floating Production Unit for the Miller Field - AKER
♦
Layout Study of Tiffany Field on a Semi-Submersible - CFEM
♦
Layout Study of Balmoral Field on a Semi-Submersible - CFEM
♦
Layout Study of Modifications for the T-2600 Jack-up - CFEM
♦
Layout Study of 20 Mbpd on the CFEM TH-2800 Semi-Submersible
♦
Layout Study of Catenary Anchored Floater for Troll - Norsk Hydro
♦
Layouts for MacCulloch Semi Conversion - AMEC
♦
Cost Estimation of 20 Mbpd on the CFEM TH-2800 Semi-Submersible
JACK-UPs
♦
Detailed Design of Jack-up Conversion - Espoir Field - Phillips
♦
Field Development Planning on the Gryphon & Forth Cluster - BP
SUBSEA
♦
Cold Start-Up Procedures for Schiehallion FPSO Wells & Manifolds– BP
UK
♦
Subsea, Risers & Topsides - Greater Plutonio FPSO - BP Angola
♦
Extended Reach Subsea Study - Shell UK
♦
Design of 8 Looped Wells in 400 ft water plus riser - Espoir Field - Phillips
♦
Confidential Feasibility Study - Esso UK
♦
Major Capex Reduction Study on Britannia Subsea Flowlines - Conoco &
Chevron
♦
Field Development Planning on the Gryphon & Forth Cluster - Kerr McGee
& BP
♦
Subsea Development of S.E. Auk - Shell
♦
Troll Subsea Studies - Norsk Hydro
PLATFORMS
WITH STEEL JACKETS
♦
Country Asset Optimisation – Dubai Petroleum Co.
♦
Zero Based Development of Natuna - Esso
♦
Engineering & Design of Pulai A & B Platforms - Malaysia - Esso
♦
Conversion of the Drilling Utilities Modules on Tembungo - Esso
♦
EPC of Satellite Drilling Platform on Texas Block 331L - Rutherford Oil
♦
EPC of Host Production Platform on Texas Block 310L - Rutherford Oil
♦
Operating Procedures Manuals - 48 volumes for Tiffany Platform- Agip
♦
Conceptual Design of the No.Cormorant Platform - Shell
♦
Conceptual Design of Morecambe Bay Phase I Stage II - British Gas
♦
Conceptual Design of Modifications on Morecambe Bay Stage II for Electrodialysis
of MEG -
British Gas
♦
Design Competition for the Shearwater Field Development - Shell
♦
Feasibility & Conceptual Design of No. Cormorant Field - Shell
♦
Pre-Conceptual Design of the Shearwater Field Development - Shell
♦
Pre-Conceptual Design of the Nelson Field Development - Shell
♦
Major Capex Reduction Study on Britannia - Conoco & Chevron
♦
Major Capex Reduction Program for ETAPs - AMEC
♦
Major Capex Reduction Study for Alba - Chevron
♦
Optimization of Strathspey as a Fixed Platform - Texaco
♦
Minimum Facilities Audit on ONGC Design - AMEC
♦
Minimum Facilities Study for Eider - Shell
♦
Minimum Facilities Study for Guillemot - Shell
♦
Minimum Facilities Consultants - Detailed Design of Gannet - Shell
♦
Minimum Facilities Study for Gryphon - Kerr McGee
♦
Minimum Facilities Wedding Cake for the Scott Field - Kerr McGee
♦
Minimum Facilities Study for USA vs UK vs Norway - Esso
♦
Feasibility Study of No. Cormorant Field - Shell
♦
Feasibility Study of Condensate Handling on the Rough Field
♦
Feasibility Study of Exhaust Gas Injection for Ekofisk - Norsk Hydro
♦
Feasibility Study of F-7/Emden - NAM
♦
Feasibility Study of Priazlomnoye Development in Russia - Hamilton Oil
♦
Feasibility Study of Pars Field Development w/ OSCO/NIOC - Esso
♦
Feasibility Study of Eugene Island Block 327 - USA - Oxy
♦
Feasibility Study of Unmanned Minimum Topsides Facilities - Total
♦
Feasibility Study of Strathspey as a Fixed Platform - Texaco
♦
Feasibility Study of Haltenbaken Development - Saga
♦
Economic Screening of Additional Development Scenarios for Snorre - Saga
♦
Economic Screening of Development of Alba & Bosun Fields - Chevron
♦
Field Development Planning For Block 30/18 - HTHP Tenneco
♦
Field Development Planning on the Gryphon & Forth Cluster (w/ GOSP)
- Kerr McGee
♦
Field Development Study - Block 2/2 - Saga
♦
Field Development Planning - Haltenbanken - NPD
♦
Layout Study of Gullfax Phase II - Steel vs GBS - Saga
♦
Layout Study of Block 30/9 Studies - Norsk Hydro
♦
Layout Study of Espoir Field - Phillips
♦
Layout Study of Fixed Steel Platforms for Troll - Norsk Hydro
♦
Audit and Major Capex Reduction White Paper on Andrew - AMEC
♦
Audit of Cost and Weight Estimates for Petromina Natuna - W.R. Grace
♦
Audit of Forties Facilities for Secondary Recovery – Esso
♦
Audit of South East Indy Development - Shell
♦
Audit of Eider Design Basis for Minimum Facilities - Shell
♦
Audit of Design and HUC of S.E. Indy - Shell
♦
Audit of Detailed Design of Eider - Shell
♦
Audit of a Minimum Self-Contained Drilling/Production Platform - Shell
♦
Audit for Simplification of Specifications & Requisitions on Tern -
Shell
♦
Audit of Hook-up Readiness for S.E. Indy - Shell
♦
Audit for Simplification of the Eider Drilling System - Shell
♦
Audit for Simplification of the Eider Field - Shell
♦
Audit of Troll Field Development - Shell
♦
Audit of Troll Development Layouts - Norsk Hydro
♦
Audit of Troll Layouts - Norsk Hydro
♦
Audit of Brage Field Feasibility Study Layouts - Norsk Hydro
♦
Process Audit for the F-3 Development - NAM
♦
Audit of Host Platform for the Bunter Field - CFEM
♦
60 Day Acceptance Review of the Tiffany Conceptual Design - AMEC
♦
Audit of Design Basis on Bruce - AMEC
♦
Audit of Esmond Field - Process Analysis
♦
Audit of Gulf of Mexico Platforms for Bankers - Process Analysis
♦
Audit and Cost Estimation for a Confidential N/S Oilfield - Spur
♦
Cost Risk Analysis on Brage Development - NPD
♦
Consultation of the Development of the Nam Uhr Reservoir - QGPC
♦
Risk Analysis for Morecambe Bay Phase I Stage II - British Gas
♦
Tern Fabrication Yard Plan - Phase I - Shell
♦
Allocation of Tiffany Capex between Tiffany & Toni - Agip
♦
Weight and Cost Estimation for the Eider Integrated Deck - Shell
♦
Cost Estimation of Confidential N/S Oil Development - Deminex
♦
Cost Estimation of Tommeliten Wellhead Platform - CFEM
♦
Cost Estimation of Southern Gas Platforms - Mobil
♦
Negotiation of PSC for Guneshili, Chirag & Azeri with Western Oil Companies
-
Republic of Azerbaijan
♦
Project Management Services on the Ameland Project - NAM
♦
Operations Philosophy for F-3 Development - NAM
♦
Contracts Preparation, Tendering, and Conditioning - Mobil
♦
Development of the Scope of Work for the Tern Tender - Shell
♦
Development of the Scope of Work for Eider Follow-On - Shell
♦
Design of Project Co-ordination Procedures for Nelson – Shell
♦
Consulting Services for Natuna Project Management Prequal - AMEC
♦
Creation of 4500 Instrument Loop Diagrams for Tiffany - Agip
♦
Writing Operating Procedures Manuals - 48 volumes for Tiffany - Agip
♦
R & D Study of Desalting MEG on Morecambe CPP1 - British Gas
♦
COFP - Definition of HUC Logic to Arrive At Earliest First Oil - Agip
♦
Process Engineering Consultancy for Eider - Shell
♦
Electrical Engineering Consultant - British Gas
♦
Process Engineering Consultancy on East Brae - Marathon
♦
Debottlenecking Study of Brae - Marathon
♦
Technical Author for Dunbar - Total
♦
Study of S.E. Forties Developed by Catalogue Engineering - BP
♦
Study of EPIC vs Distributed Contract for Tiffany – AGIP
PLATFORMS
WITH GRAVITY BASE SUBSTRUCTURES (GBS)
♦
Audit of three field development options for five fields - British Gas
♦
Pre-Conceptual Methodology for Brent 2000 - Shell
♦
Major Capex Reduction Study for Alba - Chevron
♦
Major Capex Reduction Study on Britannia - Conoco & Chevron
♦
Greenfield Modex of Cormorant/Dunlin (w/ GOSP) - Shell
♦
Feasibility Studies of Brent 2000 (w/ GOSP) - Shell
♦
Feasibility Study of Sleipner Field - Norsk Hydro
♦
Feasibility Study of "Firmfoot Island" Concept - Elkem A/S
♦
Feasibility Study of Snorre - Monotower GBS plus Floater - Saga
♦
Economic Screening of Brent 2000 - Shell
♦
Economic Screening of Sleipner Gamma - NPC
♦
Economic Screening of Gullfax Phase II - NPC
♦
Economic Screening of Additional Development Scenarios for Snorre - Saga
♦
Field Development Planning for Gullfax Phase II - Saga
♦
Economic Screening of "Firmfoot Island" Concept - Elkem A/S
♦
Pre-Study of Layout Acceptance Criteria - Statoil
♦
Conceptual Design Layouts for the Hibernia Field - CFE
♦
Layout Study of Gullfax Phase II - Steel vs GBS - Saga
♦
Layout Study of Block 30/9 Studies - Norsk Hydro
♦
Layout Study of Gullfax Phase II - Norsk Hydro
♦
Layout Study of Sleipner West Alternative II - Norsk Hydro
♦
Layout Study of Troll East - Norsk Hydro
♦
Layout Study of Integrated Deck Layouts for Hibernia - CFEM
♦
Riser Layout Studies for Oseberg GBS - Norsk Hydro
♦
Layout Study of Sleipner - Norsk Hydro
♦
Audit of Hibernia Topsides Weight - Chevron
♦
Audit of Sleipner Area Development - Phase II - Statoil
♦
Audit of Troll Field Development - Shell
♦
Audit of Topsides for the Oseberg Field Centre - Norsk Hydro
♦
Audit of Troll Development Layouts - Norsk Hydro
♦
Audit of Sleipner Field Development - Norsk Hydro
♦
Audit of Oseberg Platform - Norsk Hydro
♦
Audit of Troll Layouts - Norsk Hydro
♦
Audit of Brage Field Feasibility Study Layouts - Norsk Hydro
♦
Consultancy on Ninian Field Development - Chevron
♦
Scope of Work for the East Troll Conceptual Design - Saga
♦
Statement of Commerciality for the Troll Field - Norsk Hydro
♦
Feasibility Study of Integrated Concrete Deck - Saga
♦
Brent Rationalization Studies - Esso
♦
Engineering Study of Troll Field - Shell
♦
Wellhead Piping Study for Gullfax Phase II - Saga
PROCESS
& UTILITIES
♦
Front-End Briefing Paper on Heavy Oil Production - AMEC
♦
Front-End Briefing Paper on HPHT Field Development - AMEC
♦
Economic Screening of Applications of HP Steam - Amerada Hess
♦
Process Screening Study - Gullfax Soer - Central vs. Satellite - Saga
♦
Process Screening Studies for Snorre - Live vs Dead Crude - Saga
♦
R & D Study of UK Topsides Design Manhour Reduction - Esso
♦
R & D Study of Cost Reduction Through Technical Innovation - Esso
♦
R & D Study of UK Industry Competitiveness - Esso
♦
R & D Study of UK Design Efficiency Benchmarks - Esso
♦
R & D Study of UK Industry Competitiveness - Update - Esso
♦
R & D Study of Four-Phase Centrifugal Separator - Esso
♦
R & D Study of Topsides Specification by Linear Programming - Deminex
♦
Audit of BP Standards re Catalogue Engineering - BP
♦
Development of Gas Condensate Facilities Capex Models - Esso
♦
Technical Calibration of Worldwide Platforms on GOSP - Esso
♦
Survey of UK Industry Relative Competitiveness - Esso
♦
Benchmark Studies for Guillemot with OGM, (formerly GOSP) - Esso
♦
Study of SS Pipe Stress for Desalination - Weir Westgarth
DRILLING
♦
Audit of GCA-1 & 2 Well Planning - Noble Denton
♦
Conversion of the Drilling Utilities Modules on Tembungo - Esso
♦
Writing the Drilling Operating Procedures Manuals for Tiffany - Agip
♦
Major Capex Reduction Study on Britannia - Conoco & Chevron
♦
Feasibility Study of Packaged Drill Rigs for Nelson - Shell
♦
Risk Analysis for Morecambe Bay Phase I Stage II - British Gas
♦
Audit of Hibernia Topsides Weight with OGM, (formerly GOSP) - Chevron
♦
Audit for Simplification of the Eider Drilling System - Shell
♦
Audit of a Minimum Self-Contained Drilling/Production Platform - Shell
♦
Audit of Investment Proposal for Exploration Offshore Sierra Leone
LIVING QUARTERS
♦
Writing the LQ Operating Procedures Manuals for Tiffany - Agip
♦
Major Capex Reduction Study on Britannia - Conoco & Chevron
PIPELINES
♦
Independent Cost Estimate of Southern Swamp Associated Gas Gathering -
Shell
♦
Writing the Pipeline Operating Procedures Manuals for Tiffany - Agip
♦
Pipeline Project Engineering Consultancy in Doha, Qatar - QGPC
♦
Oil Pipeline Hydrate Study - Eider - Shell
♦
Major Capex Reduction Study on Britannia - Conoco & Chevron
ONSHORE
& REFINING
♦
Identified RC of 13 firetube failures in FWKO & Heater Treaters – Shell
♦
Identified RC of 5 Integral Compressors decline to 20% availability - Shell
♦
Design for Debottlenecking of Shell Facilities from 22 Mbpd to 109 Mbpd
– Shell
♦
Crude Dehydration alternatives for 6 mo. Inspection/Repair of T-3401 –
Shell
♦
Design for sand removal from gas feed to Gas Lift Compressors – Shell
♦
Design for removal of liquids from feed to Gas Lift System - Shell
♦
Owner’s Engr Mgr on Expansion of 122 MGJ/an Gas Plant to 183 MGJ/an - SPI
♦
Multiple optimization & safety projects on the 183 MGJ/a Gas Plant
-SPI
♦
Troubleshooting on HP Compression, LP Compression - SPI
♦
SRB/H2S Removal from Temane Gas Plant - SPI
♦
Training staff in HYSYS & Que$tor - SPI
♦
Wrote Philosophies for Pressure Equipment, Flowlines & Pipelines &
Project Management - SPI
♦
Facilities, drilling design & estimation for Mozambique Round 4 - SPI
♦
Consultancy on H2S problem on Partner-Operated Gabon FPSO - SPI
♦
Audit of the So. Shapkino Development Plan, Artic Circle, Russia – EBRD
♦
Troubleshooting of NGPT Waterflood, Well Drilling & Completion – Russia
– Timan Oil
♦
Emergency Gas Rehabilitation, Afghanistan – Asian Development Bank
♦
Market Survey for Location of a Russian Export Refinery – Lewis & Peat
♦
Audit of Batumi Refinery in Adjaria, Georgia – Lewis & Peat
♦
Audit of Investment Proposal for Karachaganak Mini-Refinery – Lewis &
Peat
♦
License applications and development of nine oil and gas fields in Kazakhstan
-
♦
Wedderburn Securities plc
♦
Technical analysis and negotiation of farm-in for 50MMb oil field in Kazakhstan
- Lewis & Peat
♦
Due Diligence for Gujarat Fields, India - AMEC/Heritage
♦
Audit of Redevelopment Risks on Two Fields in Lithuania - Noble Denton
♦
Negotiation with YPF for the Management Contract on Projecto Mega
♦
Front-End Services for Lump Sum Bid on Akshabulak with OGM, (formerly GOSP)
- AMEC
♦
Due Diligence for Gujarat Fields, India - AMEC
♦
Debottlenecking Expansion Design for the Singapore Refinery - Esso
♦
Sulphur Plant Design & Construction for the Singapore Refinery - Esso
♦
Design & Field Revamp of De-Methanizer with OGM, (formerly GOSP) 103A/D
- Libya
♦
Feasibility Study for Expansion of Dubai Gas Plant - Scimitar Petroleum
♦
Feasibility Study for Expansion of Wytch Farm - British Gas
♦
Feasibility Study of Crude Stabilization with OGM, (formerly GOSP) 103A/D
- Libya - Oxy
♦
Design Basis Memorandum (DBM) for Singapore Refinery - Esso
♦
Design Basis Memorandum (DBM) for Okinawa Refinery - Esso
♦
Audit of Petrochem Cost Estimates - USA vs UK - British Petroleum
♦
Major Capex Reduction Study on Britannia - Conoco & Chevron
♦
Safety Study for Zueitina Gas Plant - Libya - Occidental
♦
Design Of Onshore Slug Catcher - Offshore Design Partnership
♦
Process & Mechanical Design of Beef Drying Systems - Texas Trading
Post
TRAINING
COURSES
♦
Lead a 2 week seminar/course in China in 1979 on offshore production for
the Ministry
of Oil & Gas
♦
Training course at Imperial on Surface Facilities – 2 x 4 days - Sinopec
♦
Training course at Imperial on Overseas Operations – 2 x 4 days - Sinopec
♦
"Oil & Gas Field Development" - JAPEX
♦
"Offshore Operations" -2 wks - PETRONAS
♦
"Production Engineering Design" - 2 Weeks - NPC
♦
"Production of Course Materials for "Offshore Technology"- Elkem A/S
♦
"GOSP for Field Development Engineers” - Elf Aquitaine
♦
"GOSP for Field Development Engineers” - Shell
♦
"Singapore Refinery Technology" - 4 x 1 wk - Esso
♦
"Refinery Design" - 6 wks Singapore Refinery - Esso
|