AFRICA

ANGOLA

  • FEED & Cost Reduction for FPSO – BP Block 18
  • Update of Design, Cost & weight of ‘PAJ’ FPSO – BP Block 31 SE

GABON

  • Identified Root Cause of 13 firetube failures in FWKO & Heater Treaters – Shell
  • Identified Root Cause of 5 Integral Compressors decline to 20% availability – Shell
  • Optimazation of Gamba Facilities Debottlenecking, 22,000 bpd to 109,000 bpd – Shell
  • Crude dehydration alternatives for 6 month Inspection/Repair of T-3401
  • Design for sand removal from gas feed to Gas Lift Compressors
  • Design for removal of liquids from feed to Gas Lift System

IVORY COAST

  • Layout Study for the Espoir Field
  • Detailed Design of Jack up Conversion for Production – Espoir Field
  • Detailed Design of VLCC Conversion for FSU – Espoir Field

LIBYA

  • Design & Field Revamp of De-Methanizer in GOSP 103A/D
  • Safety Study for Zueitina Gas Plant
  • Feasibility Study for Crude Stabilization in GOSP 103A/D

MOZAMBIQUE

  • Modernization & Expansion of the Sasol Temane Gas Plant

NIGERIA

  • Independent Cost Estimate of Southern Swamp Associated Gas Gathering Project

SERRA LEONE

  • Audit of Investment Proposal for Exploration Offshore Sierra Leone

SOUTH AFRICA

  • Engineering Manager for Feasibility Studies on multiple Thermal Power Plants:
  • 10 GW power plant in Johannesburg using ENI/Anadarko gas from a 2,500 km, 42 inch pipeline from Northern Mozambique
  • 10 GW power plant in Mozambique using 500 kV High Voltage Direct Current (HVDC) Transmission 2,500 km to Johannesburg
  • 3 GW onshore power plant fed from offshore LNG gasification terminal
  • 2 GW power plant in Western Cape fed from offshore FPSO & deep-water gas field
  • 150 MW thermal power plant using detoxified MSW (biomass) as fuel
  • 15 MW thermail power plant using detoxified MSW (biomass) as fuel
  • Modex on 122 MGJ/an Gas Plant to 183 MGJ/an
  • Multiple optimization & safety projects on the 183 MGJ/an Gas Plant
  • Troubleshooting on HP Compression, LP Compression & SRB/H2S Removal
  • Training staff in HYSYS & Que$tor
  • Wrote SPI Philosophies for Pressure Equipment & Project Management
  • Facilities & drilling design & estimation for bidding Mozambique Round 4
  • Consultancy on H2S problem on Partner-Operated Gabon FPSO

ASIA-PACIFIC

AFGHANISTAN

  • Emergency Rehabilitation of Gas Supply and Distribution

BANGLADESH

  • Expert Witness on Gas Plant Arbitration

CHINA

  • Lead a 2 week seminar/course in 1979 on offshore production for the Ministry of Oil & Gas.

INDIA

  • Negotiation of PSC and COSA for Six Gujarat Fields
  • Technical & Investment Analysis for Six Gujarat Fields
  • Due Diligence for Seven Gujarat Fields
  • Audit for Minimum Facilities on ONGC Design

INDONESIA

  • Zero-Based Development of Natuna
  • Audit of Natuna Cost and Weight Estimates
  • Consulting Services for Natuna Project Management Prequalification
  • Zero-Based Audit of Bayu Udan FPSO

JAPAN

  • Design Basis Memorandum (DBM) for Okinawa Refinery
  • Training Course on “Oil & Gas Field Development”

MALASIA

  • Detailed Design of Pulai A & B Platforms
  • Detailed Design of Conversion of Utilities Modules on Tembungo
  • Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
  • Training Course on “Oil & Gas Field Development” – 1 week
  • Training Course on “Offshore Operations” – 2 weeks

SINGAPORE

  • Design Basis Memorandum (DBM) for Singapore Refinery
  • Debottlenecking Expansion Design for the Singapore Refinery
  • Sulphur Plant Design and Construction for the Singapore Refinery
  • Training Course on “Singapore Refinery Technology” – 4 x 1 week
  • Training Course on “Refinery Design” – 6 weeks Singapore Refinery

VIETNAM

  • Technical Audit of Basic Design of the Rang Dong Field

EUROPE & SCANDINAVIA

FINLAND

  • Feasibility Study of Semi-Submersible Conversion

FRANCE

  • Cost Est. for 20 Mbpd on the CFEM TH-2800 Semi-Submersible
  • Layout Study for 20 Mbpd on the CFEM TH-2800 Semi-Submersible
  • Layout Modifications for the CFEM T-2600 Jack-up
  • Training of Field Development Engineers on GOSP

HOLLAND

  • Operations Philosophy for F-3 Development
  • Process Audit for the F-3 Development
  • Project Management Services on the Ameland Project
  • Feasibility Study of F-7/Emden

MONACO

  • Turret & topsides Pre-FEED Study for BP PAJ FPSO in Block 31 Angola
  • Turret & topsides design for Petrobras Capixaba FPSO, offshore Brazil
  • Turret & topsides design for Petrobras Tupi Pilot FPSO, offshore Brazil
  • Turret design for Petrobras Tupi FPSO, offshore Brazil
  • Turret design for Nexus FPSO
  • Turret design for Shell LNG FPSO
  • Turret design for BP Quad 204 (Schiehallion) FPSO, UK
  • Turret design for Shtokman FPSO

NORWAY

  • Minimum Facilities Study – USA vs. UK vs. Norway
  • Field Development Options Study for South Arne
  • Feasibility Study for a TLP for Fina Exploration
  • Feasibility Study for a TLP on Troll East for Statoil
  • Feasibility Study for 40 Mbpd on an Aker H.4.2
  • Cost Estimate for the Tommeliten Wellhead Platform
  • Production of Course Materials for “Offshore Technology”
  • Feasibility Study of the “Firmfoot Island” Concept
  • Economic Screening Study of the “Firmfoot Island” Concept
  • Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
  • Audit of Statement of Commerciality
  • Layout Study for Troll East
  • Feasibility Study of Exhaust Gas Injection for Ekofisk
  • Statement of Commerciality for the Troll Field
  • Layout Study – Sleipner West Alternative II
  • Layout Studies for Gullfax Phase II
  • Platform Layouts for Block 30/9 Studies
  • Economic Screening Study of 4 Floating Substructures for Troll West
  • Layout Studies for Fixed Steel Platforms for Troll
  • Layout Studies for a Catenary Anchored Floater for Troll
  • Troll Subsea Studies
  • Riser Layout Studies for Oseberg GBS
  • Topsides Layouts for Sleipner
  • Design Philosophies for Troll
  • Audit of Troll Layouts
  • Audit of the Brage Field Feasibility Study Layouts
  • Topsides Layouts for Troll East
  • Audit of the Topsides for the Oseberg Field Centre
  • Audit of Troll Development Layouts
  • Feasibility Study for the Sleipner Field
  • Audit of the Sleipner Field Development
  • Audit of the Oseberg Platform
  • Cost Risk Analysis on Brage Development
  • Field Development Planning – Haltenbanken
  • Screening Economics Study for Gullfax Phase II
  • Screening Economics study for Sleipner Gamma
  • Training Course on “Production Engineering Design” – 2 Weeks
  • Equipment Definitions for Snorre
  • Feasibility Study of an Integrated Concrete Deck for Snorre
  • Field Development Study – Block 2/2
  • Additional Development Scenarios for Snorre
  • Vessel Contractors Layout for Snorre TLP
  • Feasibility Study for Snorre – TLP – Live vs. Dead Crude
  • Process Screening Study – Gullfax Soer – Central vs. Satellite
  • Feasibility Study for Snorre – Monotower GBS plus Floater
  • Process Screening Studies for Snorre – Live vs. Dead Crude
  • Layout Studies for Gullfax Phase II – Steel vs. GBS
  • Feasibility Study for the Haltenbaken Development
  • Production of the SoW for the East Troll Conceptual Design
  • Wellhead Piping Study for Gullfax Phase II
  • Field Development Planning for Gullfax Phase II
  • Engineering Study of Troll Field
  • Audit of Troll Field Development
  • Conceptual Design of Troll as a Floater
  • Pre-Study of Layout Acceptance Criteria
  • Layout Study for a Tension Legged Platform for Troll
  • Audit of Sleipner Area Development – Phase II
  • Consulting Services for Esso Balder Tender

SWEDEN

  • Audit of Halfdan Detailed Design

UNITED KINGDOM

  • Turret Design for Quad 204 FPSO (new Schiehallion)
  • FEED for Schiehallion FPSO Test Train Debottlenecking
  • Turret Design for Nexus FPSO
  • FEED for Schiehallion FPSO Test Train Debottlenecking
  • Audit of three field development options for five offshore gas fields
  • Benchmarking of North Sea floating production – Esso
  • Design Competition for the Shell Shearwater Field Development
  • Pre-Conceptual Design of the Shearwater Field Development
  • Facilities Design for a North Sea FPS
  • Process Operations Review of Conoco MacCulloch FPSO
  • Confidential Subsea Study
  • Allocation of Tiffany Platform Capex between Tiffany & Toni (GOSP)
  • Operating Procedures Manuals – 45 systems for Tiffany Platform
  • Tiffany Instrument Loop Diagrams – Creation of 4500 ILD’s
  • Tiffany COFP – Definition of HUC Logic To Arrive At Earliest First Oil
  • Study of EPIC vs. Distributed Contract for Tiffany
  • Layout Study for Monsanto Block 15/21a on an Aker H.4.2
  • Layout Study for Floating Production Unit for the Miller Field
  • Layouts for MacCulloch Semi Conversion
  • Layouts for Durwood/Dauntless FPSO Conversion
  • Major Capex Reduction Program for BP East of Shetlands TLP
  • Major Capex Reduction Program for ETAPs
  • Major Capex Reduction White Paper on Andrew
  • Front-End Briefing Paper on Heavy Oil Production
  • Front-End Briefing Paper on HPHT Field Development
  • Audit of Design Basis on Bruce
  • Consulting Services for Tiffany Claim
  • 60 Day Acceptance Review of Agip’s Conceptual Design on Tiffany
  • Design Mods on Morecambe Bay Stage II for Electrodialysis of MEG
  • Electrical Engineering Consultant
  • Feasibility Study for Condensate Handling on the Rough Field
  • R&D Study on Desalting MEG on the Morecambe CPP1 Platform
  • Conceptual Design for Morecambe Bay Phase I Stg II
  • Capex & Schedule Risk Analysis for Morecambe Bay Phase I Stg II
  • Feasibility Study for Expansion of Wytch Farm
  • Economic Screening Study on Applications of HP Steam Offshore
  • Field Develop’t Planning on the Gryphon & Forth Cluster (GOSP)
  • Audit of Cost Estimates for Downstream Facilities – USA vs. UK
  • Audit of BP Standards re Catalogue Engineering
  • Study of S.E. Forties Developed by Catalogue Engineering
  • Feasibility Study for Ivanhoe Field using a THP-5500
  • Layouts for Sole Pit
  • Layouts for MacCulloch Semi Conversion
  • Layouts for Durwood/Dauntless FPSO Conversion
  • Audit of the Host Platform for the Bunter Field
  • Topsides Layouts for Tiffany Field on a Semi-Submersible
  • Layout Studies for the Balmoral Field on a Semi-Submersible
  • Value Engineering Consultancy on the Britannia Field Development
  • Capex Reduction Study for Alba (GOSP)
  • Economic Screening of the Development of Alba & Bosun Fields
  • Consultancy on Ninian Field Development
  • Cost Estimation for Confidential N/S Oil Development
  • R&D Study on Topsides Specification by Linear Programming
  • Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
  • Benchmark Studies for Guillemot (GOSP)
  • Development of Gas Condensate Facilities Capex Models (GOSP)
  • Brent Rationalization Studies (GOSP)
  • Minimum Facilities Study – USA vs. UK vs. Norway
  • R&D on UK Design Efficiency Benchmarks
  • R&D on UK Industry Competitiveness – Update
  • R&D on UK Topsides Design Manhour Reduction
  • Audit of Forties Facilities for Secondary Recovery
  • R&D on Cost Reduction Through Technical Innovation
  • R&D on UK Industry Competitiveness
  • Survey of UK Industry Relative Competitiveness
  • Field Develop’t Planning on the Gryphon & Forth Cluster (GOSP)
  • Minimum Facilities Study on Gryphon (w/ GOSP)
  • Debottlenecking study of Brae
  • Process Engineering Consultancy on East Brae
  • Cost Estimation for Southern Gas Platforms
  • Contracts Preparation, Tendering, and Conditioning
  • Design Of Onshore Slug Catcher
  • Audit of the Esmond Field
  • Extended Reach Subsea Review
  • Feasibility Study of Packaged Drill Rigs for Nelson
  • Training of Field Development Engineers on GOSP
  • Minimum Greenfield Modex of Cormorant/Dunlin (GOSP)
  • Screening Economics & Feasibility Studies on Brent 2000 (GOSP)
  • Pre-Conceptual Methodology for Brent 2000
  • Pre-Conceptual Design of the Nelson Field Development (GOSP)
  • Design of Project Co-ordination Procedures for Nelson
  • Minimum Facilities Consultants During Detailed Design of Gannet
  • Minimum Facilities Feasibility Study on Guillemot (GOSP)
  • Development of the Scope of Work for Eider Follow-On
  • Process Engineering Consultancy for Eider
  • Audit of Detailed Design of Eider
  • Audit of a Minimum Self-Contained Drilling/Production Platform
  • Audit for Simplification of Specifications & Requisitions on Tern
  • Audit of Hook-up Readiness for S.E. Indy
  • Oil Pipeline Hydrate Study – Eider
  • Audit for Simplification of the Eider Drilling System
  • Audit for Simplification of the Eider Field
  • Tern Fabrication Yard Plan – Phase 1
  • Development of the Scope of Work for the Tern Tender
  • Audit of the Design and HUC of S.E. Indy
  • Eider Minimum Facilities Study
  • Weight and Cost Estimation for the Eider Integrated Deck
  • Audit of the South East Indy Development
  • Audit of the Eider Design Basis for Minimum Facilities
  • Feasibility Study for Subsea Development of S.E. Auk
  • Feasibility & Conceptual Design of No. Cormorant Field
  • Audit and Cost Estimation for a Confidential N/S Oilfield
  • Feasibility Studies of Beef Drying Systems
  • Technical Author for Dunbar
  • Feasibility Study for Unmanned Minimum Topsides Facilities
  • Study of Stainless Steel Pipe Stress for Desalination
  • Field Development Planning For Block 30/18 – HTHP
  • Optimization of Strathspey as a Fixed Platform
  • Feasibility Study of Strathspey as a Fixed Platform

FORMER SOVIET UNION

AZERBAIJAN

  • Negotiation of PSA for GCA with the Western Oil Companies
  • Audit of GCA 1 & 2 Well Planning for Drilling
  • White Paper on Project Execution in the Caspian Sea

GEORGIA

  • Audit of Batumi Refinery in Adjaria

KAZAKHSTAN

  • License applications and development of nine oil and gas fields
  • Technical analysis and negotiation of farm-in for 50 MMbbl oil field
  • Technical & Investment Analysis for 125 MMbbl field
  • Audit of Investment Proposal for Karachaganak Mini-Refinery
  • Front-End Services for Lump Sum on Akshabulak Field Facilities
  • White Paper on Project Execution in the Caspian

LITHUANIA

  • Audit of Redevelopment Risks on Two Oil Fields

RUSSIA

  • Facilities & Management Audit – Water Flood
  • Field Development Audit of So. Shapkino Development
  • Feasibility Study for the Priazlomnoye Development
  • Market Survey for Location & DBM of a Russian Export Refinery

TURKMENISTAN

  • Field Development & Cost Estimate in the Caspian Sea

UZBEKISTAN

  • Due diligence on investment in 2 Blocks of oil & gas.

MIDDLE EAST

DUBAI

  • Feasibility Study of Expansion of Dubai Gas Plant
  • Country Asset Optimisation

IRAN

  • Feasibility Study of the Pars Field Development
  • Contracting Strategy for Iranian Buy-Back Contract Development

QATAR

  • Pipeline Project Engineering Consultancy in Doha, Qatar
  • Consultation of the Development of the Nam Uhr Reservoir

NORTH AMERICA

CANADA

  • Feasibility Study for Hibernia on a THP-10,000
  • Conceptual Design Layouts for the Hibernia Field
  • Integrated Deck Layouts for Hibernia
  • Audit of Hibernia Topsides Weight (GOSP)

UNITED STATES

  • EPC of Host Production Platform on Texas Block 310L
  • EPC of Satellite Drilling Platform on Texas Block 331L
  • Feasibility Study for Eugene Island Block 327 – USA
  • Audit of Gulf of Mexico Platforms for Investment Institutions
  • R&D on a Four-Phase Centrifugal Separator
  • Audit of Cost Estimates for Downstream Facilities – USA vs. UK
  • Calibration of UK, Norwegian, Malaysian and US Platforms on GOSP
  • Minimum Facilities Study – USA vs. UK vs. Norway

SOUTH AMERICA

ARGENTINA

  • Negotiation with YPF for the Mgt Contract on Projecto Mega

BRAZIL

  • Topsides & Turret Design for Tupi FPSO – Petrobras
  • Topsides & Turret Design for Capixaba FPSO – Petrobras
  • Turret Design for Tupi Pilot FPSO – Petrobras